Box 8
Container
Contains 4 Results:
Report on Ruins Stabilization at Pueblo Alto (New Alto), 1947
File — Box: 8
Identifier: Coll 0021/01-18
Scope and Content
From the Series:
RSU REPORTS, some annual reports Photographs of walls before and after stabilization and treatment forms documenting the type of stabilization performed were assembled on an annual basis and bound into Ruin Stabilization Report volumes by the project director. Depending on the amount of work documented, records from work at multiple sites might be bound in a single volume, or there might be multiple volumes for a single year, arranged by site.
Dates:
1947
Report on 'Chettro Kettle' (Chetro Ketl) Emergency Stabilization of 1948, 1947 - 1948
File — Box: 8
Identifier: Coll 0021/01-19
Scope and Content
From the Series:
RSU REPORTS, some annual reports Photographs of walls before and after stabilization and treatment forms documenting the type of stabilization performed were assembled on an annual basis and bound into Ruin Stabilization Report volumes by the project director. Depending on the amount of work documented, records from work at multiple sites might be bound in a single volume, or there might be multiple volumes for a single year, arranged by site.
Dates:
1947 - 1948
Stabilization Report for Site Bc-50 (Tseh So), 1949
File — Box: 8
Identifier: Coll 0021/01-20
Scope and Content
From the Series:
RSU REPORTS, some annual reports Photographs of walls before and after stabilization and treatment forms documenting the type of stabilization performed were assembled on an annual basis and bound into Ruin Stabilization Report volumes by the project director. Depending on the amount of work documented, records from work at multiple sites might be bound in a single volume, or there might be multiple volumes for a single year, arranged by site.
Dates:
1949
Stabilization Report for Pueblo del Arroyo 1949-1950 (photocopy), 1951 July
File — Box: 8
Identifier: Coll 0021/01-21
Scope and Content
From the Series:
RSU REPORTS, some annual reports Photographs of walls before and after stabilization and treatment forms documenting the type of stabilization performed were assembled on an annual basis and bound into Ruin Stabilization Report volumes by the project director. Depending on the amount of work documented, records from work at multiple sites might be bound in a single volume, or there might be multiple volumes for a single year, arranged by site.
Dates:
1951 July