Skip to main content

Stack-drawer 33/2

 Container

Contains 14 Results:

Kantor-Edwards Rio Grande Office Albuquerque, New Mexico, 9/19/84

 File — Stack-Drawer: 33/2, Folder: 1
Identifier: nmuswamchenrydrawings
Scope and Contents Elevations; Floor Plan: Window Wall Schedules, Typical Wall Sections; Building Sections: Room Finish Schedule; Foundation Plan: Details, Plot Plan, Design Criteria; Roof Framing Plan Details; Electrical Plan Schedule; Mechanical Plan: Schedules, Details
Dates: 9/19/84

Melvyn D. Baron: Apartment Additions: 4600-4604 Zuni SE Albuquerque, New Mexico, , 2/22/85

 File — Stack-Drawer: 33/2, Folder: 2
Identifier: nmuswamchenrydrawings
Scope and Contents Elevations, Floor Plan; Foundation Plan, Building Sections and Details; Electrical and Mechanical Plans; Roof Framing; Plot Plan
Dates: 2/22/85

Pre-Cast Concrete Septic Tank Company Albuqeruque, New Mexico, 2/26/85

 File — Stack-Drawer: 33/2, Folder: 3
Identifier: nmuswamchenrydrawings
Scope and Contents Plan, Section, Details, Exterior Forms: Upper Half, Cavity Forms: Upper Half, Exterior Forms: Upper Half, Cavity Forms: Lower Half, Base Plate Plans and Details, Connector Details
Dates: 2/26/85

Mann Residence Albuquerque, New Mexico, 1/10/86

 File — Stack-Drawer: 33/2, Folder: 4
Identifier: nmuswamchenrydrawings
Scope and Contents Working Drawings of Greenhouse, Greenhouse Sections and Elevations
Dates: 1/10/86

Servant Quarters and Horse Stable for Bob Kantor Albuquerque, New Mexico, 7/31/86-12/10/86

 File — Stack-Drawer: 33/2, Folder: 5
Identifier: nmuswamchenrydrawings
Scope and Contents Elevations, Plot Plan, Floor Plan, Foundation Plan and Details, Roof Frame Plan, Site Plan: Foundation Details, Mechanical Plan, Horse Stable
Dates: 7/31/86-12/10/86

El Paraiso Center: 6501 4th Street, El Paraiso Subdivision Albuquerque, NM, 4/21/86-8/5/86

 File — Stack-Drawer: 33/2, Folder: 6
Identifier: nmuswamchenrydrawings
Scope and Contents Site Plan and East Elevation; Typical Wall Sections; General Notes; Roof Framing Plan/Window and Door Schedules (2 copies); Site Plan: Building Data, Design Criteria; Elevations; Floor Plan, Window and Door Schedules; Mechanical and HVAC Plan; Lighting Plan and Fixture Schedule; power Plan; Grading and Drainage Plan for El Paraiso Center, Hall Engineering Company Inc.
Dates: 4/21/86-8/5/86

Coronado State Monument Albuquerque-Bernalillo, New Mexico, 8/25/86

 File — Stack-Drawer: 33/2, Folder: 7
Identifier: nmuswamchenrydrawings
Scope and Contents Elevations, Building Sections and Restrooms, Floor Plan/Restrooms and Mechanical Room, Foundation Plan/Roof Frame Plan and East Elevation, Plumbing Plan/Electrical Plan/Fixture Schedules/Details and Restrooms, Plot Plan/Restrooms, Preliminary Design: Restrooms and Mechanical Room, Floor Plan and East Elevation
Dates: 8/25/86

Coronado State Monument Albuquerque-Bernalillo, New Mexico, 2/13/86

 File — Stack-Drawer: 33/2, Folder: 8
Identifier: nmuswamchenrydrawings
Scope and Contents Watercolor Drawings (2); Floor Plan; Electrical Plan; Roof Frame; Elevations and Wall Sections
Dates: 2/13/86

Joe Edwards Residence: Lot 357, Sandia Heights, South Unit, #3, Albuquerque-Bernalillo County, New Mexico, 2/24/87

 File — Stack-Drawer: 33/2, Folder: 9
Identifier: nmuswamchenrydrawings
Scope and Contents Plot Plan, South, North, East, West Elevations, Main Level Floor Plan, Upper Level and Basement Floor Plans, Foundation Plan, Foundation Details, Roof Framing Plan #1, Roof Framing Plan, Building Sections
Dates: 2/24/87

McKinney Residence Addition, 607 17th Street Albuquerque, New Mexico, 8/10/87

 File — Stack-Drawer: 33/2, Folder: 10
Identifier: nmuswamchenrydrawings
Scope and Contents Site Plan, Zone Map; Floor Plan, Wall Section; Roof Floor Plan, Foundation Plan; Electrical Plan; Mechanical Plan
Dates: 8/10/87

Mr. and Mrs Dennis and Marge Valliant, Proposed Repairs: 309 San Felipe NW Albuquerque, New Mexico, 9/16/88 and 9/21/88

 File — Stack-Drawer: 33/2, Folder: 11
Identifier: Job No 1387
Scope and Contents Floor Plan: Proposed Repair #1, Floor Plan: Proposed Repair #2, Architectural Changes/Notes, Plumbing/Heating, Outside Guide, Roof Framing, Site Plan
Dates: 9/16/88 and 9/21/88

Patio Escondido: 404 San Felipe NW Albuquerque, New Mexico, 3/17/88-4/29/88

 File — Stack-Drawer: 33/2, Folder: 12
Identifier: nmuswamchenrydrawings
Scope and Contents Floor Plan, Elevations; Building A--Mechanical Electrical; Building A--Site Plan, Framing, Sections; Building F--Floor Plan, Elevation, Foundation, Framing Plans; Building F--Mechanical Plan, Electrical Plan
Dates: 3/17/88-4/29/88

Fire Damage Repair: Lafayette Square Apartments, Building 18, Albuquerque, New Mexico, 7/19/88

 File — Stack-Drawer: 33/2, Folder: 13
Identifier: Job No 1123
Scope and Contents Plot Plan: First Floor Elevations; Typical Two-Unit Plan, First Floor Apartments: 101, 102, 103 and 104 (Note: The last two are identical.); Typical Two-Unit Mechanical Plan, First-Floor Apartments: same as units listed above; Typical Two-Unit Electrical Plans: same as units listed above; Roof Framing Plan
Dates: 7/19/88

Thompkins Residence: Addition Albuquerque, New Mexico, 11/17/89

 File — Stack-Drawer: 33/2, Folder: 14
Identifier: nmuswamchenrydrawings
Scope and Contents Basement Plan; Elevations; First-Floor Plan; Second-Floor Plan; Framing Plans; Floor Details; Roof Details; Electrical Plan; Mechanical Plan
Dates: 11/17/89