[Marquez Place] The Loft at Marquez Place (Santa Fe); Development Plan Report, March 2000
Item — Item: 7
Scope and Contents
Prepared for The Lofts, LLC
Prepared by Tigges Planning Consultants, Inc.; Praxis Architects; High Desert Surveying; Morey Walker and Associates Engineering, Inc.
Prepared by Tigges Planning Consultants, Inc.; Praxis Architects; High Desert Surveying; Morey Walker and Associates Engineering, Inc.
Dates:
March 2000
St. John’s College Campus (Santa Fe); Amended Master Preliminary Development Plan Report, December 2008
Item — Item: 7
Scope and Contents
Prepared by Tigges Planning Consultants, Inc.; Sarcon Construction; David Perrigo, Architect; Morey Walker Engineering; Design Workshop
Dates:
December 2008