Box 2
Container
Contains 5 Results:
Lensic Plaza (Santa Fe); Traffic Impact Analysis, October 1999
Item — Box: 2, Item: 1
Scope and Contents
Prepared for Greer Enterprises, Inc.
Prepared by Walker Engineering
Prepared by Walker Engineering
Dates:
October 1999
Nava Ade: Belonging to the Land; Final Subdivision Plat Report, Phase IA, June 1996
Item — Box: 2, Item: 11
Scope and Contents
Prepared for Auerbach Southwest Ltd. Co.
Prepared by Walker Engineering; Lloyd and Tryk Architects; Red Mountain Engineers; JHK and Associates, Traffic Engineers; Tigges Planning Consultants
Prepared by Walker Engineering; Lloyd and Tryk Architects; Red Mountain Engineers; JHK and Associates, Traffic Engineers; Tigges Planning Consultants
Dates:
June 1996
Old Las Vegas Highway Project; Plant and Garden Center; (Santa Fe County) Master Plan Report, August 1999
Item — Box: 2, Item: 12
Scope and Contents
Prepared by Tigges Planning Consultants, Inc.; Hogan Group, Inc.; Corbin Consulting, Inc.
Dates:
August 1999
Parkway Lofts Project (Santa Fe) Final Development Plan Report, October 2004
Item — Box: 2, Item: 14
Scope and Contents
Prepared by Tigges Planning Consultants, Inc.; Design Solutions
Dates:
October 2004
Rancho Estrada Subdivision (Santa Fe) Development Reports, (February 1994)
Item — Box: 2, Item: 18
Scope and Contents
Prepared for Antonio R. Garcez and Henry C. Estrada
Prepared by Q/A Consulting Engineers
Prepared by Q/A Consulting Engineers
Dates:
(February 1994)