Chamiso Heights Office Park (Santa Fe); Final Development Plan Report, July 2003

 Item — Item: 16
Scope and Contents Prepared for Arnold Simonsen

Prepared by Tigges Planning Consultants, Inc.; Red Mountain Engineering; Architectural Alliance; Walker Engineering
Dates: July 2003

Plaza Entrada Office Complex (Santa Fe): Final Development Plan Report, June 2000

 Item — Item: 16
Scope and Contents Prepared by Tigges Planning Consultants, Inc.; Design Collaborative Southwest
Dates: June 2000

Smith’s Food and Drug Center (Edgewood); Preliminary Development Plan Report, September 1998

 Item — Item: 16
Scope and Contents Prepared by Great Basin Engineering; Tigges Planning Consultants, Inc.; A-Trans Engineering; Geo-Test, Inc.
Dates: September 1998