Item 9
Container
Contains 3 Results:
Campos de Suenos Subdivision (Santa Fe); Final Subdivision Plat Report: Las Acequias Phase III, Tract 3, April 1996
Item — Item: 9
Scope and Contents
Prepared for Campos de Suenos, Joint Venture: Grubesic, Quintana, Stanke
Prepared by Tigges Planning Consultants, Inc.; Walker Engineering; Terraplen Architects
Prepared by Tigges Planning Consultants, Inc.; Walker Engineering; Terraplen Architects
Dates:
April 1996
Mission Viejo School and Mission Viejo Subdivision (Santa Fe) Preliminary Development Plan and Subdivision Plat Report, August 2001
Item — Item: 9
Scope and Contents
Prepared by Tigges Planning Consultants, Inc.; Hogan Group, Inc.; Walker Engineering, Inc.
Dates:
August 2001
St. Michaels Office Park (Santa Fe); Phase 2 Development Plan Report, October 2004
Item — Item: 9
Scope and Contents
Prepared for SMOP-2 LLC
Prepared by Tigges Planning Consultants, Inc.; Roger Lengyal and Associates; Walker Engineering, Inc.
Prepared by Tigges Planning Consultants, Inc.; Roger Lengyal and Associates; Walker Engineering, Inc.
Dates:
October 2004